12. CONCLUSION AND RECOMMENDATION
12.1 Conclusions
12.1.1 1-hour TSP impact
monitoring were carried out in the reporting month. No Action / Limit Level
exceedance at AM1 and AM2 was recorded during the period.
12.1.2 Construction noise
monitoring were carried out in the reporting month. No Action / Limit Level
exceedance at CM1, CM2 and CM3 was recorded during the period.
12.1.3 No Action and Limit
Level exceedance were recorded for water quality at M1, M2 and M3 in the
reporting month.
12.1.4 Ardeid night roost
monitoring was carried out in the reporting month. Of the two confirmed ardeid
night roosts during the pre-construction survey, only ANR 1 was observed to be
active. No Action / Limit Level
exceedance at NMS1 and NMS2 was recorded during the period.
12.1.5 Ecological bird
monitoring was carried out in the reporting month. One exceedance in Action
Level was recorded for the ecological monitoring of birds on 15 & 20
September 2021. This was the significant decline in species abundance of all
avifauna species for the point count method. However, the exceedance was not project-related.
12.1.6 Five environmental site
inspections were carried out in the reporting month. Recommendations on
mitigation measures for Permit/ Licenses were given to the Contractor for
remediating the deficiencies identified during the site inspections.
12.1.7 Five landscape and visual
site audits were carried out in the reporting month. Recommendations on
mitigation measures for Permit/ Licenses were given to the Contractor for
remediating the deficiencies identified during the site inspections.
12.1.8 Referring to the
Contractor’s information, no environmental complaint, notification of summons
and successful prosecution was received in the reporting month.
12.2 Comment
and Recommendations
12.2.1 The recommended
environmental mitigation measures, as proposed in the EIA report and EM&A
Manual shall be effectively implemented to minimize the potential environmental
impacts from the Project. The EM&A programme would effectively monitor the
environmental impacts generated from the construction activities and ensure the
proper implementation of mitigation measures.
12.2.2 According to the
environmental site inspections performed in the reporting month, the following
recommendations were provided:
Air Quality Impact
·
The Contractor is reminded to cover the excavated soil properly with tarpaulin
sheets to prevent dust emission for trial pit.
·
Wind blown dust is observed
when the truck is leaving at site exit. The Contractor should provide mitigation measures to prevent dust
emission from vehicle wheel & body.
·
The Contractor is required to improve the mitigation at present wheel
wash area at southern exit (e.g. provide better bedding of aggregates for preventing
muddy water).
Construction Noise Impact
·
No specific observation was identified in the reporting month.
Water Quality Impact
·
The Contractor is
reminded to provide MSDS information at WetSep.
·
Mitigation measures should be provided to intercept silty runoff from
the piling area.
Chemical and Waste Management
·
The Contractor is
reminded to provide drip tray for the chemicals to prevent accidental spillage.
·
The Contractor is reminded to cover the excavated soil properly with tarpaulin
sheets to prevent dust emission.
Land Contamination
·
No specific observation was identified in the reporting month.
Ecological Impact
·
No specific observation was identified in the reporting month.
Landscape and Visual Impact
·
No specific observation was identified in the reporting month.
Hazard to Life
·
No specific observation was identified in the reporting month.
Permit/ Licenses
·
No specific observation was identified in the reporting month.