12. CONCLUSION
AND RECOMMENDATION
12.1 Conclusions
12.1.1 1-hour TSP impact monitoring were carried out in the reporting
month. No Action / Limit Level exceedance at AM1 and AM2 was recorded during
the period.
12.1.2 Construction noise monitoring were carried out in the reporting
month. No Action / Limit Level exceedance at CM1, CM2 and CM3 was recorded during
the period.
12.1.3 No Action and Limit Level exceedance were recorded for water
quality at M1, M2 and M3 in the reporting month.
12.1.4 Ardeid night roost monitoring was carried out in the reporting
month. Of the two confirmed ardeid night roosts during the pre-construction
survey, only ANR 1 was observed to be active.
No Action / Limit Level exceedance at NMS1 and NMS2 was recorded during
the period.
12.1.5 Ecological bird monitoring was carried out in the reporting
month. No Action / Limit Level exceedance was recorded during this period.
12.1.6 Four environmental site inspections were carried out in the
reporting month. Recommendations on mitigation measures for Permit/ Licenses were given to the Contractor for
remediating the deficiencies identified during the site inspections.
12.1.7 Four landscape and visual site audits were carried out in the
reporting month. Recommendations on mitigation measures for Permit/ Licenses
were given to the Contractor
for remediating the deficiencies identified during the site inspections.
12.1.8 Referring to the Contractor’s information, no environmental
complaint, notification of summons and successful prosecution was received in
the reporting month.
12.2 Comment and Recommendations
12.2.1 The recommended environmental mitigation measures, as proposed in
the EIA report and EM&A Manual shall be effectively implemented to minimize
the potential environmental impacts from the Project. The EM&A programme
would effectively monitor the environmental impacts generated from the
construction activities and ensure the proper implementation of mitigation
measures.
12.2.2 According to the environmental site inspections performed in the
reporting month, the following recommendations were provided:
Air Quality Impact
·
The Contractor is recommended to increase watering for dust suppression
during demolition of workshop.
Construction Noise Impact
·
No specific observation was identified in the reporting month.
Water Quality Impact
·
Provide mitigation
to prevent direct discharge of silt-laden water into the storm drain near the
boot cleaning basin.
Chemical and Waste Management
·
Drip tray should be provided for the chemical as mitigation to prevent
accidental spillage.
Land Contamination
·
No specific observation was identified in the reporting month.
Ecological Impact
·
The contractor is reminded to maintain and reinstate the silentup at the northern site boundary.
Landscape and Visual Impact
·
No specific observation was identified in the reporting month.
Hazard to Life
·
No specific observation was identified in the reporting month.
Permit/ Licenses
·
No specific observation was identified in the reporting month.