8. SITE INSPECTION AND AUDIT
8.1.1 Site audits were carried out by ET on weekly basis to monitor the
implementation of proper environmental management practices and mitigation
measures in the Project site.
8.1.2 In the reporting month, four site inspections were carried out on 4,
10, 18 and 25 August 2021.
8.1.3 No outstanding issues were reported during the reporting month. The
ET Leader’s Site Environmental Audit are summarized in Appendix M.
8.2 Advice on the Solid and Liquid Waste Management
Status
8.2.1 The Contractor registered as a chemical waste producer for the Contract.
Sufficient numbers of receptacles were available for
general refuse collection and sorting.
8.2.2 The waste generated by the construction and disposal ground is presented
in Table
8.1.
8.2.3 The monthly summary of waste flow table is detailed in Appendix I.
8.2.4 If off-site disposal is required, the excavated marine mud from
the land-based works shall be disposed of at the designated disposal sites
within Hong Kong as allocated by the Marine Fill Committee or other locations
as agreed by the Director. The Contractor shall ensure no spilling and
overflowing of materials during loading / unloading / transportation is
allowed.
8.2.5 The Contractor was reminded that chemical waste containers should
be properly treated and stored temporarily in designated chemical waste storage
area on site in accordance with the Code of Practice on the Packing, Labelling
and Storage of Chemical Waste.