1.
2.
3.
4.
5.
6.
7.
8.
9.
IMPLEMENTATION
STATUS OF ENVIRONMENTAL MITIGATION MEASURE
The Contractor had implemented environmental mitigation measures
and requirements as stated in the EIA Report, the EP and EM&A Manual. The
implementation status of the environmental mitigation measures
during
the reporting period is summarized in Appendix J.