11.1.1
1-hour
TSP impact monitoring were carried out in the reporting month. No Action /
Limit Level exceedance at AM1 and AM2 was recorded during the period.
11.1.2
Construction
noise monitoring were carried out in the reporting month. No Action / Limit
Level exceedance at CM1, CM2 and CM3 was recorded during the period.
11.1.3
An
Action Level exceedance was recorded for water quality in the reporting month.
The exceedance was recorded at M1 on 10 June 2021. A Limit Level exceedance was
recorded for water quality in the reporting month. The exceedance was recorded
at M1 on 8 June 2021. It was found that these exceedances were not
project-related.
11.1.4
Ardeid
night roost monitoring was carried out in the reporting month. Of the two
confirmed ardeid night roosts during the pre-construction survey, only ANR 1
was observed to be active. No
Action / Limit Level exceedance at NMS1 and NMS2 was recorded during the
period.
11.1.5
Ecological
bird monitoring was carried out in the reporting month. Two exceedances in
Action Level were recorded during this period¡¦s monitoring of birds including
significant declines in species diversity of all avifauna species in the
community; and species diversity of species of conservation importance only for
the point count method. However, the exceedances were not project-related.
11.1.6
Five
environmental site inspections were carried out in the reporting month.
Recommendations on mitigation measures for Permit/ Licenses were given to the Contractor
for remediating the deficiencies identified during the site inspections.
11.1.7
Five
landscape and visual site audits were carried out in the reporting month.
11.1.8
Referring
to the Contractor¡¦s information, no environmental complaint, notification of
summons and successful prosecution was received in the reporting month.
11.2.1
The
recommended environmental mitigation measures, as proposed in the EIA reports
and EM&A Manuals shall be effectively implemented to minimize the potential
environmental impacts from the Project. The EM&A programme would
effectively monitor the environmental impacts generated from the construction
activities and ensure the proper implementation of mitigation measures.
11.2.2
According
to the environmental site inspections performed in the reporting month, the
following recommendations were provided:
Air Quality Impact
¡P
No
specific observation was identified in the reporting month. .
Construction Noise Impact
¡P
No
specific observation was identified in the reporting month.
Water
Quality Impact
¡P
Mitigation
measures should be provided to prevent runoff from the temporary administration
building works area flowing out to the nullah.
¡P
Mitigation
measure should be provided at inlet / outlet of channel at catchpit to prevent
discharge of water.
¡P
The
contractor is reminded to provide mitigation measure to prevent silt / silty
runoff getting into storm drain and / or checking the existing pipe network for
temporarily sealing up manhole at excavation near piling area.
Chemical
and Waste Management
¡P
No
specific observation was identified in the reporting month.
Active Ardeid Night Roost
Impact
¡P
No
specific observation was identified in the reporting month.
Ecology of Birds Impact
¡P
No
specific observation was identified in the reporting month.
Land Contamination
¡P
No
specific observation was identified in the reporting month.
Landscape and Visual
Impact
¡P
Establish
protective barrier for retain trees T250 & T251.
¡P
Retain
trees T252, T253 ¡V Trench work within tree protection zone has to be reviewed
and follow specification of works and exercise care when doing work.
Hazard to Life
¡P
No
specific observation was identified in the reporting month.
Permit/ Licenses
¡P
No