6.                         IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURE

6.1                       Implementation Status

The Contractor had implemented environmental mitigation measures and requirements as stated in the EIA Report, the EP and EM&A Manual. The implementation status of the environmental mitigation measures during the reporting period is summarized in Appendix G.