4.1 – Observations and Recommendations of Site Audit
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
Air
Quality |
NA |
||
Noise |
2 June 2021 |
Reminder 2: The contractor was reminded to properly maintain the
function of the noise barrier. (Portion 1) |
NA |
Water
Quality |
5 May 2021 |
Reminder: The
contractor was reminded to properly cover the excavated material and trial
trench. (Portion 1 YLSTW) |
NA |
20 May 2021 |
Observation 1: Mitigation measures should be provided to intercept
silty runoff from the piling area. (Portion 1 YLSTW) |
24 May 2021 |
|
20 May 2021 |
Observation
2: Enhance
mitigation by providing sandbags along inner edge
of U channel to prevent inflow of silty runoff. (Portion 1 YLSTW) |
24 May 2021 |
|
20 May 2021 |
Observation 3: Silty deposit on road and in gullies should be cleaned. (Portion 1
YLSTW) |
24 May 2021 |
|
2 June 2021 |
Observation: Mitigation
measures (eg. sandbags / coverings) should be
provided to prevent runoff from the temporary administration building works
area flowing out to the nullah. (Portion 1) |
3 June 2021 |
|
2 June 2021 |
Reminder 1: |
NA |
|
16 June 2021 |
Reminder:
Enhance
the mitigation measure to prevent runoff flowing out to the nullah at area
near temporary administration building. (Portion 1) |
NA |
|
30 June 2021 |
Reminder: The contractor is reminded to provide mitigation
measure to prevent silt / silty runoff getting into storm drain and / or
checking the existing pipe network for temporarily sealing up manhole at
excavation near piling area. (Portion 1) |
NA |
|
Chemical
and Waste Management |
NA |
||
Land
Contamination |
NA |
||
|
11 May 2021 |
Reminder: The
contractor was reminded to provide protection zones for trees near the
workshop / storage areas. (Portion 1 YLSTW) |
NA |
Landscape
and Visual Impact |
16 June 2021 |
Recommendation: Establish protective barrier for retain trees T250
& T251. (Portion 1) |
NA |
30 June 2021 |
Recommendation:
Retain
trees T252, T253 – Trench work within tree protection zone has
to be reviewed and follow specification of works and exercise care
when doing Work.
(Portion 1 near temporary workshop) |
NA |
|
Permit
/ Licenses |
21 April 2021 |
Reminder: (Portion 1 YLSTW). |
NA |
Others |
NA |