Table 1.2 – Main Construction Works Carried out in the Reporting Period

January 2023

February 2023

March 2023

·   ELS works and RC structure works at IW & PST;

·   Installation of 813mm pipe pile at south and East of AGS;

·   Superstructure works at CLP substation;

·   E&M work at MIC office;

·   Ground investigation at SD & STB;

·   Installation of steel cover for at Zone 2B chamber:

·   Sheet piling installation around Sludge digester no. 1 – 3;

·   Demolition of Air Floatation Thickener (remaining Bay 9);

·   Installation of sheet pile at TTS;

·   Installation of concrete blocks and soil Surcharge at Biogas Holder no. 1;

·   Installation of sheet pile at SD;

·   Installation of sheet pile at STB; and

·   Disposal of construction waste as indicated in Appendix F.

·   ELS works and RC structure works at IW & PST;

·   Installation of 813mm pipe pile at North, West and East of AGS;

·   ABWF and E&M works at CLP substation;

·   E&M work at MIC office;

·   Ground investigation at SDB;

·   Sheet piling installation around Sludge digester no. 1 – 3:

·   Installation of sheet pile at TTS;

·   Installation of concrete blocks and soil Surcharge at Biogas Holder no. 1;

·   Installation of sheet pile at STB;

·   Taken sample of Env. Drill holes at AFT;

·   Excavation of trench for laying power cables and cable draw pits near entrance of YLSTP; and

·   Disposal of construction waste as indicated in Appendix F.

·   ELS works and RC structure works at IW & PST;

·   Installation of 813mm pipe pile at North and West of AGS;

·   ABWF and E&M works at CLP substation;

·   Ground investigation at SDB;

·   Sheet piling installation around Sludge digester no. 1 – 3;

·   Installation of sheet pile at TTS:

·   Installation of concrete blocks and soil Surcharge at Biogas Holder no. 1;

·   Installation of sheet pile at STB;

·   Road diversion work for construction of UC no. 5;

·   Taken sample of Env. Drill holes at AFT;

·   Excavation of trench for laying power cables and cable draw pits near entrance of YLSTP; and

·   Disposal of construction waste as indicated in Appendix F.