February
2023 |
March 2023 |
|
· ELS works and RC structure works at IW & PST; ·
Installation of 813mm pipe pile at south and East of AGS; · Superstructure works at CLP substation; · E&M work at MIC office; · Ground investigation at
SD & STB; · Installation of steel cover for at Zone 2B chamber: · Sheet piling installation around Sludge digester no. 1 – 3; · Demolition of Air Floatation Thickener (remaining Bay 9); · Installation of sheet pile at TTS; · Installation of concrete blocks and soil Surcharge at
Biogas Holder no. 1; · Installation of sheet pile at SD; · Installation of sheet pile at STB;
and ·
Disposal
of construction waste as indicated in Appendix F. |
·
ELS works
and RC structure works at IW & PST; ·
Installation of 813mm pipe pile at North, West and East of AGS; ·
ABWF and E&M works at CLP substation; ·
E&M
work at MIC office; ·
Ground investigation at SDB; ·
Sheet
piling installation around Sludge digester no. 1 – 3: ·
Installation of sheet pile at TTS; ·
Installation
of concrete blocks and soil Surcharge at Biogas Holder no. 1; ·
Installation
of sheet pile at STB; ·
Taken
sample of Env. Drill holes at AFT; ·
Excavation of trench for laying power cables and cable draw pits near
entrance of YLSTP; and · Disposal of construction waste as
indicated in Appendix F. |
·
ELS works
and RC structure works at IW & PST; ·
Installation of 813mm pipe pile at North and West of AGS; ·
ABWF and E&M works at CLP substation; ·
Ground
investigation at SDB; ·
Sheet piling installation around Sludge digester no. 1 – 3; ·
Installation
of sheet pile at TTS: ·
Installation of concrete blocks and soil Surcharge at Biogas Holder no.
1; ·
Installation
of sheet pile at STB; ·
Road
diversion work for construction of UC no. 5; ·
Taken
sample of Env. Drill holes at AFT; ·
Excavation of trench for laying power cables and cable draw pits near
entrance of YLSTP; and · Disposal of construction waste as
indicated in Appendix F. |