Table
5.1 – Observations and Recommendations of Site Audit
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
Air
Quality |
4 Jan 2023 |
Recommendation 1: The Contractor is recommended to
increase watering for dust suppression at haul roads (Portion 1 - YLSTW). |
4 Jan 2023 |
14 Feb 2023 |
Observation 1: Fugitive
dust is observed at TTS area. Provide mitigation measure e.g.
increase water spraying for dust suppression at TTS area (Portion 1 - YLSTW). |
28 Feb 2023 |
|
21 Feb 2023 |
Reminder 1: The Contractor is
reminded to increase watering for dust suppression at TTS area (Portion 1 -
YLSTW). |
28 Feb 2023 |
|
14 Mar 2023 |
Reminder 2: The
Contractor is reminded to increase watering for dust suppression at TTS area (Portion
1 - YLSTW). |
14 Mar 2023 |
|
Noise |
10 Jan 2023 |
Reminder 1: The Contractor is reminded to maintain
and reinstate the silentup at the northern site
boundary (Portion 1 - YLSTW). |
11 Jan 2023 |
Water
Quality |
29 Mar 2023 |
Recommendation 2:
The Contractor is recommended to provide mitigation measures to prevent silty
runoff getting into the storm drain in STB and TTS Areas (Portion 1 - YLSTW). |
NA |
Chemical
and Waste Management |
18 Jan 2023 |
Reminder 1: The Contractor is reminded to provide
drip tray for the oil drum to prevent spillage (Portion 1 - YLSTW). |
20 Jan 2023 |
1 Feb 2023 |
Reminder 1: The
Contractor is reminded to provide drip tray for the chemical containers. (Portion
1 - YLSTW). |
2 Feb 2023 |
|
14 Mar 2023 |
Reminder 1: The Contractor is
reminded to clear the oil stain on ground under the compressor and treat it as
chemical waste for disposal (Portion 1 - YLSTW). |
14 Mar 2023 |
|
Land
Contamination |
NA |
||
Ecological
Impact |
29 Mar 2023 |
Recommendation 1: The Contractor is
recommended to maintain and reinstate the bird curtains at the eastern and northern
site boundary (Portion 1 - YLSTW). |
NA |
Landscape
and Visual Impact |
10 Jan 2023 |
Reminder 1: Remove stockpile
(uPVC pipes) inside Tree Protection Zone of T188 (Portion 1 - YLSTW). |
11 Jan 2023 |
26 Jan 2023 |
Reminder 1: The Contractor is reminded to erect
a proper Tree Protection Zone for preserved trees T183 – T187 (Portion 1 -
YLSTW). |
31 Jan 2023 |
|
21 Feb 2023 |
Recommendation
1: Crown cleaning to remove broken and hanging branches at east side of TTS (Portion
1 - YLSTW). |
28 Feb 2023 |
|
28 Feb 2023 |
Recommendation 1: Please observe
proper pruning procedures to avoid causing damages to the branches to be pruned
(Portion 1 - YLSTW). |
28 Feb 2023 |
|
14 Mar 2023 |
Reminder 1: Please
keep tree protection zone free of construction materials (Portion 1 - YLSTW). |
14 Mar 2023 |
|
Permit
/ Licenses |
NA |
||
Others |
NA |