Table 7.1 – Status of submissions required under the EP

EP Condition

(EP-565/2019)

Submission Title

Submission Status

Condition 2.9

Construction Phase Emergency Response Plan

Submitted to EPD with ET certification and IEC verification, to be finalised and made available for public inspection via the dedicated website.

Condition 2.11

Pre-construction Ardeid Night Roost Survey Report

Submitted to EPD with ET certification and IEC verification, finalised and available for public inspection via the dedicated website.

EM&A Manual Sec. 7.3.3 & 7.3.4

Baseline Bird Survey Report

Submitted to EPD with ET certification and IEC verification, finalised and available for public inspection via the dedicated website.

Condition 2.12

Noise Mitigation Measures Plan

Submitted to EPD with ET certification and IEC verification, finalised and available for public inspection via the dedicated website.

Condition 2.13

Proposal for Minimization of Overspill Light to Ecological Sensitive Areas

Submitted to EPD with ET certification and IEC verification, finalised and available for public inspection via the dedicated website.

Condition 2.14

Supplementary Contamination Assessment Plan

Submitted to EPD with ET certification and IEC verification, finalised and available for public inspection via the dedicated website.

Condition 2.14

Contamination Assessment Report for Main Storeroom & Workshops

Submitted to EPD with ET certification and IEC verification, finalised and available for public inspection via the dedicated website.

Condition 2.14

Contamination Assessment Report for Mechanical Workshop

Submitted to EPD with ET certification and IEC verification, finalised and available for public inspection via the dedicated website.

Condition 2.14

Contamination Assessment Report for Waste Storage Area

Submitted to EPD with ET certification and IEC verification, finalised and available for public inspection via the dedicated website.

Condition 2.14

Contamination Assessment Report for SAS Thickener House-1

Submitted to EPD with ET certification and IEC verification, finalised and available for public inspection via the dedicated website.

Condition 2.14

Contamination Assessment Report for SAS Thickener House-2

Certified by ET Leader and verified by IEC on 30 March 2023 and will be submitted to EPD, to be finalised and made available for public inspection via the dedicated website.

Condition 2.15

Landscape and Visual Mitigation Plan

Submitted to EPD with ET certification and IEC verification, to be finalised and made available for public inspection via the dedicated website.

Condition 3.3

Baseline Monitoring Report

Submitted to EPD with ET certification and IEC verification, finalised and available for public inspection via the dedicated website.

Condition 3.4

Monthly EM&A Report (from April 2021 to March 2023)

Submitted to EPD with ET certification and IEC verification, finalised and available for public inspection via the dedicated website.

Condition 3.5

Quarterly EM&A Report (from April 2021 to December 2022)

Submitted to EPD with ET certification and IEC verification, finalised and available for public inspection via the dedicated website.

Condition 4.2

Environmental Monitoring Data from April 2021 to March 2023

Submitted to EPD with ET certification and IEC verification, finalised and available for public inspection via the dedicated website.