4. LAND CONTAMINATION
4.1 Contamination Assessment Report
4.1.1 Risk-Based
Remediation Goals (RBRGs) for Industrial have been adopted for the “Main
Storeroom & Workshops” and the laboratory results for the sampling works (conducted
between 30 June 2021 to 16 July 2021) show that there are no exceedances of the
adopted RBRGs for the “Main Storeroom & Workshops”. As no contaminated soil
and groundwater was found within the “Main Storeroom & Workshops”, no
remediation actions are required for contaminated soil and groundwater for the
scheduled land use of the “Main Storeroom & Workshops”. Their findings are
summarized in Contamination Assessment Report (CAR) and submitted to EPD on 1 November
2021.
4.1.2 Risk-Based
Remediation Goals (RBRGs) for Industrial have been adopted for the “Mechanical
Workshop” and the laboratory results for the sampling works (conducted between
23 July 2021 to 4 August 2021) show that there are no exceedances of the
adopted RBRGs for the “Mechanical Workshop”. As no contaminated soil and
groundwater was found within the “Mechanical Workshop”, no remediation actions
are required for contaminated soil and groundwater for the scheduled land use
of the “Mechanical Workshop”. Their findings are summarized in Contamination
Assessment Report (CAR) and submitted to EPD on 23 November 2021.
4.1.3 Risk-Based Remediation Goals
(RBRGs) for Industrial
have been adopted
for the “Waste Storage Area”
and the laboratory
results for the
sampling works (conducted
between 24 November 2021 to
26 January 2022)
show that there are no exceedances of the adopted RBRGs for the “Waste
Storage Area”. As no contaminated soil and groundwater was found within the “Waste
Storage Area”, no remediation actions are required for contaminated soil and groundwater
for the scheduled land use of the “Waste Storage Area”. Their findings are summarized
in Contamination Assessment Report (CAR) and submitted to EPD on 29 April 2022.
4.1.4 Risk-Based Remediation
Goals (RBRGs) for Industrial have been adopted for the “SAS Thickener House-1”
and the laboratory results for the sampling works (conducted between 13 April
2022 to 16 May 2022) show that there are no exceedances of the adopted RBRGs
for the “SAS Thickener House-1”. As no contaminated soil and groundwater was
found within the “SAS Thickener House-1”, no remediation actions are required
for contaminated soil and groundwater for the scheduled land use of the “SAS
Thickener House-1”. Their findings are summarized in Contamination Assessment
Report (CAR) and submitted to EPD on 6 July 2022.