November 2022 |
December 2022 |
|
·
Piling work at STB; ·
ELS works and RC structure works at IW & PST: ·
Zone 3 Diversion works: ·
Temp. Gravity thickening tank – Pipe laying
and E&M installation work; ·
Temp. Sludge Holding Tank – Pipe laying and
E&M installation work; ·
Temp. Water heater house – Pipe laying and
E&M installation work; ·
Temp. Primary Sludge Pumping Station – Pipe
laying and E&M installation work; ·
Temp. Digested sludge pump / Supernatant
Pumping – Pipe laying and E&M installation work; ·
Digested Sludge Pumping Station house – Pipe
laying and E&M installation work; ·
Installation of 813mm pipe pile at south and East
of AGS; ·
Superstructure works at CLP substation; ·
E&M work at MIC office; ·
Demolition work: ·
Water Heater House; ·
Sludge Holding Tank no. 2; ·
Air Floatation Thickener; ·
Settled Sewage Overflow Chamber; ·
Auxiliary Pumping Station; ·
PST no. 4; ·
Construction of CLP Substation; ·
Ground investigation at AGS; ·
E&M installation work for at Zone
2B chamber; ·
Pipe laying for Zone 2B; ·
Sheet piling installation around Sludge digester no. 1 – 3; ·
E&M installation at Zone 2B chamber; and ·
Disposal of construction waste as indicated
in Appendix F. |
· Piling loading test at STB; · ELS works and RC
structure works at IW & PST; · Installation of 813mm pipe pile at south and
East of AGS; · Superstructure works at CLP substation; · E&M
work at MIC office; · Demolition work at North of A.tank no. 5-8; · Ground
investigation at SD & STB; · E&M
installation work for at Zone 2B chamber; · Break through existing manhole by coring machine for Zone 2B diversion work; · Sheet piling installation around
Sludge digester no. 1 – 3; · Backfilling work at Sludge Digester
no. 1-3 and Biogas Holder no. 1;
and · Disposal of construction waste as
indicated in Appendix F. |
· ELS works and RC structure works at IW & PST; · Installation of 813mm pipe pile at south and East of AGS; · Superstructure works at CLP substation; · E&M work at MIC office; · Ground investigation at SD & STB; · Installation of steel cover for at
Zone 2B chamber; · Sheet piling installation around
Sludge digester no. 1 – 3; · Demolition of Air Floatation
Thickener (remaining Bay 9); · Installation of sheet pile at TTS; · Installation of brand drain at
Biogas Holder no. 1; · Installation of concrete blocks and
soil Surcharge at Biogas Holder no. 1; · Construction of temp. traffic road
at north of SHT no. 3 & 4; · Installation of sheet pile at STB;
and · Disposal of construction waste as
indicated in Appendix F. |