Table 5.1 – Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

7 Nov 2022

Reminder 1:

The Contractor is reminded to increase watering for dust suppression during the demolition of sludge digestion tank (Portion 1 - YLSTW).

7 Nov 2022

21 Dec 2022

Recommendation 1:

The Contractor is recommended to increase watering for haul roads (Portion 1 - YLSTW).

21 Dec 2022

Noise

13 Dec 2022

Reminder 1:

The Contractor is reminded to maintain and reinstate the Sound Proof Canvas properly at the western site boundary near Sludge Digestion Tank (SDT) (Portion 1 - YLSTW).

13 Dec 2022

28 Dec 2022

Reminder 1:

The Contractor is reminded to maintain and reinstate the silentup and sound proof canvas at the western site boundary (Portion 1 - YLSTW).

28 Dec 2022

Water Quality

NA

Chemical and Waste Management

11 Oct 2022

Reminder 1:

The Contractor is reminded chemical containers should be placed on drip tray to prevent chemical leakage (Portion 1 - YLSTW).

11 Oct 2022

16 Nov 2022

Reminder 1:

The Contractor is reminded to provide drip tray for chemical containers to prevent chemical leakage near Tree T188 (Portion 1 - YLSTW).

16 Nov 2022

Land Contamination

NA

Ecological Impact

NA

Landscape and Visual Impact

11 Oct 2022

Observation 1:

Please keep tree protection zone free of construction materials beside CLP substation (Portion 1 - YLSTW).

12 Oct 2022

7 Nov 2022

Reminder 1:

T184 – T188: Stockpile shall be removed under dripline areas. Proper fence should be provided to indicate Tree Protection Zone (TPZ) (Portion 1 - YLSTW).

7 Nov 2022

16 Nov 2022

Reminder 1:

Removal of stockpile under T188’s dripline and erect Tree Protection Zone (TPZ) (Portion 1 - YLSTW).

16 Nov 2022

13 Dec 2022

Recommendation 1:

Please pay extra caution when operating heavy machinery near trees (Portion 1 - YLSTW).

13 Dec 2022

Permit / Licenses

NA

Others

NA