5.1 – Observations and Recommendations of Site Audit
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
Air
Quality |
7 Nov 2022 |
Reminder 1: The Contractor is reminded to
increase watering for dust suppression during the demolition of sludge
digestion tank (Portion 1 - YLSTW). |
7 Nov 2022 |
21 Dec 2022 |
Recommendation 1: The Contractor
is recommended to increase watering for haul roads (Portion 1 - YLSTW). |
21 Dec 2022 |
|
Noise |
13 Dec 2022 |
Reminder 1: The Contractor is reminded to
maintain and reinstate the Sound
Proof Canvas properly at the western site boundary near Sludge
Digestion Tank (SDT) (Portion 1 - YLSTW). |
13 Dec 2022 |
28 Dec 2022 |
Reminder 1: The Contractor
is reminded to maintain and reinstate the silentup and
sound proof canvas at the western site boundary (Portion
1 - YLSTW). |
28 Dec 2022 |
|
Water
Quality |
NA |
||
Chemical
and Waste Management |
11 Oct 2022 |
Reminder 1: The Contractor
is reminded chemical containers should be placed on drip tray to prevent
chemical leakage (Portion 1 - YLSTW). |
11 Oct 2022 |
16 Nov 2022 |
Reminder 1: The Contractor is reminded to
provide drip tray for chemical containers to prevent chemical leakage near
Tree T188 (Portion 1 - YLSTW). |
16 Nov 2022 |
|
Land
Contamination |
NA |
||
Ecological
Impact |
NA |
||
Landscape
and Visual Impact |
11 Oct 2022 |
Observation 1: Please keep tree
protection zone free of construction materials beside CLP substation (Portion
1 - YLSTW). |
12 Oct 2022 |
7 Nov 2022 |
Reminder 1: T184 – T188: Stockpile shall be
removed under dripline areas. Proper fence should be provided to indicate
Tree Protection Zone (TPZ) (Portion 1 - YLSTW). |
7 Nov 2022 |
|
16 Nov 2022 |
Reminder 1: Removal of
stockpile under T188’s dripline and erect Tree Protection Zone (TPZ) (Portion
1 - YLSTW). |
16 Nov 2022 |
|
13 Dec 2022 |
Recommendation 1: Please pay extra caution when operating
heavy machinery near trees (Portion 1 - YLSTW). |
13 Dec 2022 |
|
Permit
/ Licenses |
NA |
||
Others |
NA |