5.
SITE
INSPECTION AND AUDIT
5.1.1
Site audits were
carried out by ET on weekly basis at least once per week to monitor the
implementation of proper environmental management practices and mitigation
measures in the Project site.
5.1.2
In the reporting
period, 12 site inspections were carried out (site audit of 15 February 2022
was cancelled and rescheduled to 23 February 2022). No outstanding issues were
reported during the reporting period. Details of observations recorded during
the site inspections are presented in Table 5.1.
5.2
Advice on the Solid and Liquid Waste Management Status
5.2.1
The Contractor
registered as a chemical waste producer for the Contract. Sufficient
numbers of receptacles were available for general refuse collection and
sorting.
5.2.2
The management of waste
generated by the construction is presented in Table 5.2.
5.2.3
The amount of
wastes generated by the site activities in the reporting period is shown in Appendix F.
5.2.4
If off-site
disposal is required, the excavated marine mud from the land-based works shall
be disposed of at the designated disposal sites within Hong Kong as allocated
by the Marine Fill Committee or other locations as agreed by the Director. The
Contractor shall ensure no spilling and overflowing of materials during loading
/ unloading / transportation is allowed.
5.2.5
The Contractor was
reminded that chemical waste should be properly handled temporarily in
designated chemical waste storage area on site in accordance with the Code of