4.
SITE
INSPECTION AND AUDIT
4.1.1
Site audits were
carried out by ET on weekly basis to monitor the implementation of proper
environmental management practices and mitigation measures in the Project site.
4.1.2
In the reporting
period, 13 site inspections were carried out. No outstanding issues were reported
during the reporting period. Details of observations recorded during the site
inspections are presented in Table 4.1.
4.2
Advice on the Solid and Liquid Waste Management Status
4.2.1
The Contractor
registered as a chemical waste producer for the Contract. Sufficient
numbers of receptacles were available for general refuse collection and
sorting.
4.2.2
The waste generated
by the construction and disposal ground is presented in Table 4.2.
4.2.3
The amount of
wastes generated by the site activities in the reporting period is shown in Appendix F.
4.2.4
If off-site
disposal is required, the excavated marine mud from the land-based works shall
be disposed of at the designated disposal sites within Hong Kong as allocated
by the Marine Fill Committee or other locations as agreed by the Director. The
Contractor shall ensure no spilling and overflowing of materials during loading
/ unloading / transportation is allowed.
4.2.5
The Contractor was
reminded that chemical waste containers should be properly treated and stored
temporarily in designated chemical waste storage area on site in accordance
with the Code of Practice on the Packing, Labelling and Storage of Chemical
Waste.